📋 EXAMPLE REPORT This is a sample. Real PARs are tied to live GPS jobs.
← View all 10 examples
✅ CERTIFIED REPORT
📋 EXAMPLE
🌿 EPA BMP
Environmental Compliance & BMP Audit
Example Certified Post-Action Report · Washington WA Ecology NPDES WAR10A001
CPAR-EX-007
Wednesday, April 22, 2026
Fence / Composite Decking
Pacific Northwest Clean LLC
4,200 sqft
47.60530, -122.34170
✅ Certified
4 Pillars of Compliance 📋 Chemical Log ✓ · 📸 Photos ✓ · 🧪 pH Log ✓ · ⏱ Surface + Method ✓ · 💧 Water Recovery ✓
📍

Job Details

Site address, surface type, crew & GPS coordinates
01
Property Address📍 1011 Western Ave, Seattle, WA 98104
Surface TypeFence / Composite Decking
Job DateWednesday, April 22, 2026
Crew Name👷 Pacific Northwest Clean LLC
Area Cleaned4,200 sqft
Dwell Time⏱ 5 minutes
Permit🌿 WA Ecology NPDES WAR10A001
Permit AuthorityWashington State Dept. of Ecology
GPS Coordinates📡 47.60530, -122.34170 ✓ Captured
Report GeneratedApril 22, 2026
📍 GPS: 47.60530, -122.34170  ·  Open in map ↗
🧪

Chemical Application Log

Products used, dilution ratios & volume documentation — SH 1% · Spray & Forget (1 oz/gal)
02
Chemical Product Volume Applied Notes / Dilution
Sodium Hypochlorite 12.5% (diluted to 1%)
⚠️ See SDS below · OSHA HazCom 2012
12.00 gal Cedar-safe concentration — protects wood fibers from SH degradation
Spray & Forget Composite Safe Surfactant
⚠️ See SDS below · OSHA HazCom 2012
2.00 gal 1 oz/gal; pH-neutral, safe for Trex and TimberTech decking
🌿

pH Neutralization Log

Pre- and post-application runoff pH readings — EPA 6.0–9.0 discharge standard
03
⬆ pH Before (Baseline)
7.4
✅ pH After (Neutralized)
6.8
✅ Final pH within EPA-acceptable range (6.0–9.0). Gatekeeper: PASS.
TimeLocationpH ReadingNote
08:00 Deck drainage trough 7.4 Baseline — rainwater-influenced, relatively neutral
09:15 Deck drainage trough 7.0 Mid-wash
09:50 Deck drainage trough 6.8 Post-rinse — within WA Ecology 6.0–9.0 standard
💧

Wastewater Recovery

Gallons captured for proper disposal · EPA NPDES compliance
04
💧 34 gallons recovered
Gallons Recovered💧 34 gal
Disposal Method🚛 Vacuumed and transported offsite per WA Ecology NPDES WAR10A001 permit conditions
Compliance Note✅ Wastewater documented per NPDES requirements
📸

Job Site Photos

Before, during & after — visual compliance documentation
05
📷Before — Fence / Composite Decking
🔵During — Chemical application
After — Surface restored
📋 Photo placeholders shown. Real PARs include uploaded before/during/after photos stored in your account.
⚠️

Safety Data Sheets (SDS)

OSHA HazCom 2012 — product safety information for all chemicals used
06
🧪
Sodium Hypochlorite 12.5%
⚠️ HAZMAT · GHS05 (Corrosive) · GHS07 (Irritant)
⬇ Download SDS
PPE RequiredChemical-resistant gloves, safety glasses
Spill ResponseDilute with large amounts of water.
NotesCedar-safe at 1% — protects Puget Sound from oxidant runoff.
🫧
Spray & Forget Composite Safe Surfactant
⚠️ HAZMAT · Non-hazmat
⬇ Download SDS
PPE RequiredGloves recommended
Spill ResponseRinse with water.
NotespH-neutral. Safe for composite decking and cedar.
🏅

SurfaceOps Certification

Compliance attestation & verification record
07
Operator Compliance Statement: The undersigned operator certifies that all information contained in this Post-Action Report is accurate and complete. Chemical products were applied in accordance with SDS guidelines and applicable EPA/state stormwater Best Management Practices. Runoff was managed per the documented disposal method, and all pH readings were recorded at time of service.
Crew / Operator
Pacific Northwest Clean LLC
Surface Type
Fence / Composite Decking
Job Date
Wednesday, April 22, 2026
Report Number
CPAR-EX-007
← View all 10 examples ⚡ Generate My PAR Preview (Free) →
This is a sample. Real PARs are tied to live GPS jobs and your crew's data.
Free Preview Order Your Certified PAR — $99