✅ CERTIFIED REPORT
📋 EXAMPLE
🌿 EPA BMP
Environmental Compliance & BMP Audit
Example Certified Post-Action Report · New York SPDES GP-0-24-001
CPAR-EX-003
Thursday, April 2, 2026
Concrete / Flatwork
Empire State Pressure LLC
22,000 sqft
42.65470, -73.75810
✅ Certified
4 Pillars of Compliance 📋 Chemical Log ✓ · 📸 Photos ✓ · 🧪 pH Log ✓ · ⏱ Surface + Method ✓ · 💧 Water Recovery ✓
📍

Job Details

Site address, surface type, crew & GPS coordinates
01
Property Address📍 1 Commerce Plaza, Albany, NY 12260
Surface TypeConcrete / Flatwork
Job DateThursday, April 2, 2026
Crew Name👷 Empire State Pressure LLC
Area Cleaned22,000 sqft
Dwell Time⏱ 15 minutes
Permit🌿 SPDES GP-0-24-001
Permit AuthorityNYS DEC Division of Water
GPS Coordinates📡 42.65470, -73.75810 ✓ Captured
Report GeneratedApril 2, 2026
📍 GPS: 42.65470, -73.75810  ·  Open in map ↗
🧪

Chemical Application Log

Products used, dilution ratios & volume documentation — SH 3% · Downstream Defense (1 oz/gal)
02
Chemical Product Volume Applied Notes / Dilution
Sodium Hypochlorite 12.5% (diluted to 3%)
⚠️ See SDS below · OSHA HazCom 2012
80.00 gal Parking deck degreasing — heavy organic load from vehicle traffic
Downstream Defense Degreaser
⚠️ See SDS below · OSHA HazCom 2012
10.00 gal 1 oz/gal; breaks down oil/grease before SH application
pH Down (Citric Acid Solution)
⚠️ See SDS below · OSHA HazCom 2012
15.00 gal Post-wash neutralizer; concrete runoff typically alkaline 10–12
🌿

pH Neutralization Log

Pre- and post-application runoff pH readings — EPA 6.0–9.0 discharge standard
03
⬆ pH Before (Baseline)
11.2
✅ pH After (Neutralized)
7.6
✅ Final pH within EPA-acceptable range (6.0–9.0). Gatekeeper: PASS.
TimeLocationpH ReadingNote
05:45 Level P1 drain 11.2 Baseline — concrete alkalinity typical for uncleaned decks
09:30 Level P1 drain 9.8 Mid-wash — SH application active
11:45 Level P1 drain 7.6 Post-neutralizer — meets SPDES 6.5–8.5 discharge standard
💧

Wastewater Recovery

Gallons captured for proper disposal · EPA NPDES compliance
04
💧 198 gallons recovered
Gallons Recovered💧 198 gal
Disposal Method🚛 Vacuumed and transported offsite per SPDES GP-0-24-001 permit conditions
Compliance Note✅ Wastewater documented per NPDES requirements
📸

Job Site Photos

Before, during & after — visual compliance documentation
05
📷Before — Concrete / Flatwork
🔵During — Chemical application
After — Surface restored
📋 Photo placeholders shown. Real PARs include uploaded before/during/after photos stored in your account.
⚠️

Safety Data Sheets (SDS)

OSHA HazCom 2012 — product safety information for all chemicals used
06
🧪
Sodium Hypochlorite 12.5%
⚠️ HAZMAT · GHS05 (Corrosive) · GHS07 (Irritant)
⬇ Download SDS
PPE RequiredChemical-resistant gloves, goggles, splash guard
Spill ResponseDilute with large amounts of water.
NotesApplied at 3% for heavy organic load on concrete.
🛢️
Downstream Defense Degreaser
⚠️ HAZMAT · GHS07 (Irritant)
⬇ Download SDS
PPE RequiredGloves, safety glasses
Spill ResponseAbsorb with inert material, rinse with water.
NotesAlkaline degreaser for vehicle contamination on parking decks.
⚗️
pH Down Citric Acid Solution
⚠️ HAZMAT · Non-hazmat
⬇ Download SDS
PPE RequiredGloves recommended
Spill ResponseDilute with water.
NotesFood-grade citric acid. Lowers alkaline runoff pH to acceptable range.
🏅

SurfaceOps Certification

Compliance attestation & verification record
07
Operator Compliance Statement: The undersigned operator certifies that all information contained in this Post-Action Report is accurate and complete. Chemical products were applied in accordance with SDS guidelines and applicable EPA/state stormwater Best Management Practices. Runoff was managed per the documented disposal method, and all pH readings were recorded at time of service.
Crew / Operator
Empire State Pressure LLC
Surface Type
Concrete / Flatwork
Job Date
Thursday, April 2, 2026
Report Number
CPAR-EX-003
← View all 10 examples ⚡ Generate My PAR Preview (Free) →
This is a sample. Real PARs are tied to live GPS jobs and your crew's data.