📋 EXAMPLE REPORT This is a sample. Real PARs are tied to live GPS jobs.
← View all 10 examples
✅ CERTIFIED REPORT
📋 EXAMPLE
🌿 EPA BMP
Environmental Compliance & BMP Audit
Example Certified Post-Action Report · Arizona AZ ADEQ AZPDES Permit AZS000003
CPAR-EX-006
Sunday, March 15, 2026
EIFS / Stucco Exterior
Desert Pro Wash AZ
14,500 sqft
33.58550, -112.07240
✅ Certified
4 Pillars of Compliance 📋 Chemical Log ✓ · 📸 Photos ✓ · 🧪 pH Log ✓ · ⏱ Surface + Method ✓ · 💧 Water Recovery ✓
📍

Job Details

Site address, surface type, crew & GPS coordinates
01
Property Address📍 7677 N 16th St, Phoenix, AZ 85020
Surface TypeEIFS / Stucco Exterior
Job DateSunday, March 15, 2026
Crew Name👷 Desert Pro Wash AZ
Area Cleaned14,500 sqft
Dwell Time⏱ 10 minutes
Permit🌿 AZ ADEQ AZPDES Permit AZS000003
Permit AuthorityArizona Department of Environmental Quality
GPS Coordinates📡 33.58550, -112.07240 ✓ Captured
Report GeneratedMarch 15, 2026
📍 GPS: 33.58550, -112.07240  ·  Open in map ↗
🧪

Chemical Application Log

Products used, dilution ratios & volume documentation — SH 2% · Elemonator (0.5 oz/gal)
02
Chemical Product Volume Applied Notes / Dilution
Sodium Hypochlorite 12.5% (diluted to 2%)
⚠️ See SDS below · OSHA HazCom 2012
44.00 gal Roof stucco — algae and desert dust removal; zero-discharge to storm infrastructure
Elemonator Non-ionic Surfactant
⚠️ See SDS below · OSHA HazCom 2012
4.50 gal 0.5 oz/gal; improves adhesion on textured stucco surface
🌿

pH Neutralization Log

Pre- and post-application runoff pH readings — EPA 6.0–9.0 discharge standard
03
⬆ pH Before (Baseline)
8.6
✅ pH After (Neutralized)
7.3
✅ Final pH within EPA-acceptable range (6.0–9.0). Gatekeeper: PASS.
TimeLocationpH ReadingNote
05:30 Pool equipment drain 8.6 Baseline — Arizona hardwater, naturally elevated pH
09:00 Pool equipment drain 8.1 Mid-wash
10:30 Pool equipment drain 7.3 Post-rinse — within ADEQ 6.0–9.0 discharge standard
💧

Wastewater Recovery

Gallons captured for proper disposal · EPA NPDES compliance
04
💧 118 gallons recovered
Gallons Recovered💧 118 gal
Disposal Method🚛 Vacuumed and transported offsite per AZ ADEQ AZPDES Permit AZS000003 permit conditions
Compliance Note✅ Wastewater documented per NPDES requirements
📸

Job Site Photos

Before, during & after — visual compliance documentation
05
📷Before — EIFS / Stucco Exterior
🔵During — Chemical application
After — Surface restored
📋 Photo placeholders shown. Real PARs include uploaded before/during/after photos stored in your account.
⚠️

Safety Data Sheets (SDS)

OSHA HazCom 2012 — product safety information for all chemicals used
06
🧪
Sodium Hypochlorite 12.5%
⚠️ HAZMAT · GHS05 (Corrosive) · GHS07 (Irritant)
⬇ Download SDS
PPE RequiredChemical-resistant gloves, safety goggles, full-face shield on roof work
Spill ResponseDilute with large amounts of water.
NotesApplied at 2% on stucco — ADEQ Maricopa zero-discharge protocol.
🫧
Elemonator Non-ionic Surfactant
⚠️ HAZMAT · GHS07 (Irritant)
⬇ Download SDS
PPE RequiredGloves, safety glasses
Spill ResponseAbsorb with inert material.
NotesNon-ionic surfactant. Clings to textured stucco for better dwell.
🏅

SurfaceOps Certification

Compliance attestation & verification record
07
Operator Compliance Statement: The undersigned operator certifies that all information contained in this Post-Action Report is accurate and complete. Chemical products were applied in accordance with SDS guidelines and applicable EPA/state stormwater Best Management Practices. Runoff was managed per the documented disposal method, and all pH readings were recorded at time of service.
Crew / Operator
Desert Pro Wash AZ
Surface Type
EIFS / Stucco Exterior
Job Date
Sunday, March 15, 2026
Report Number
CPAR-EX-006
← View all 10 examples ⚡ Generate My PAR Preview (Free) →
This is a sample. Real PARs are tied to live GPS jobs and your crew's data.
Free Preview Order Your Certified PAR — $99