<\!DOCTYPE html> Limestone Façade Soft Wash Compliance Report Sample — SurfaceOps <\!-- Open Graph --> <\!-- Twitter Card --> <\!-- Schema.org --> <\!-- Fonts --> <\!-- Sample Banner -->

PAR-SAMPLE-001

<\!-- Sticky Action Bar -->
SurfaceOps PAR-SAMPLE-001 — Limestone Façade Soft Wash
Want this for your jobs? Start free →
<\!-- Main Report Container -->
<\!-- Breadcrumb --> <\!-- PAR Cover -->
✅ 100% Compliant BMP 5/5 SAMPLE DATA
Post-Action Compliance Report — Limestone Façade Soft Wash
PAR-SAMPLE-001  •  Rivera Exterior Solutions  •  April 14, 2026
PAR-SAMPLE-001
123 Sample Plaza, Suite 400
April 14, 2026
3,200 sq ft
Soft Wash
2h 45m
● Completed
100%
<\!-- Section 1: Environmental Perimeter -->
🌿

Environmental Perimeter

BMP checklist, weather conditions, and drain protection measures
01
BMP Checklist — 5/5 Complete
Work area perimeter inspected and contained prior to application PASS
Storm drain plugged with rubber drain plug before chemical application began PASS
Wet vac on standby for emergency spill containment; tested prior to job start PASS
Rinse water collected via boom and directed to sanitary sewer — no discharge to storm PASS
SDS sheets on-site for all three chemicals; operator reviewed PPE requirements pre-task PASS
Weather Conditions at Time of Service
Temperature 72°F (22.2°C) — within acceptable soft wash range
Sky Conditions Partly cloudy; no precipitation recorded during service window
Wind Speed / Direction 4 mph NW — low drift risk; no overspray mitigation required beyond standard
Relative Humidity 58% — suitable for chemical dwell; evaporation rate moderate
Drain Protection & Disposal
Drain Protection Rubber plug installed in nearest storm drain inlet prior to SH application. Plug removed only after full rinse cycle and water reclaim confirmed.
Wastewater Disposal Rinse water collected via collection boom; vacuumed and directed to sanitary sewer connection on property. No effluent reached the municipal storm system.
Spill Standby Equipment Wet vac (6-gallon, 1.5 HP), absorbent pads (qty 6), neutralizer spray (citric acid 10% solution)
<\!-- Section 2: Substrate Protection -->
🏛

Substrate Protection

Surface specification, dwell times, and pH entry/exit verification
02
Surface Specification
Surface Type 🧱 Natural Limestone   Light-colored, exterior façade (porous, sedimentary)
Cleaning Method Soft Wash   Downstream injection at low pressure (<100 PSI at nozzle)
Contaminants Removed Biological growth (algae, lichen colonies); atmospheric carbonation staining; general airborne particulate buildup
Pre-Service Inspection Surface inspected for efflorescence, hairline cracks, and mortar joint integrity. Minor surface efflorescence noted in lower panel; documented and left intact per scope of work. No structural compromise identified.
Application Parameters
Parameter Value Notes
SH Concentration 0.6% Downstream injection from 12.5% stock; diluted inline
Surfactant Mix Rate 2 oz / gal Ecover Pro-Clean Concentrate; biodegradable, non-ionic
Dwell Time 5 min 30 sec Timed from last application stroke; no run-off before dwell complete
Application Pressure <100 PSI Soft wash nozzle; no impact pressure on limestone face
Rinse Pressure 800 PSI Post-dwell rinse from 18" standoff to clear residual SH and surfactant
Surface Area Treated 3,200 sq ft All four elevations of façade; ground level to 22 ft
Volume Summary
Mix Type Gallons Applied % of Total
SH Mix (0.6% + surfactant) 110 gal
79%
Post-Dwell Rinse (fresh water) 30 gal
21%
140 gal
Total Applied
3,200
Sq Ft Treated
0.044
Gal / Sq Ft
5m 30s
Dwell Time
pH Verification — Entry & Exit
pH Entry 7.2 Acceptable range: 6.0 – 9.0 ✅ In Range
pH Exit 7.4 Acceptable range: 6.0 – 9.0 ✅ In Range
pH measured at storm drain collection point using calibrated digital pH meter (ATC-enabled). Exit pH within 0.2 units of entry baseline — confirms full neutralization of SH residual post-rinse.
<\!-- Section 3: Chemical Documentation -->
⚖️

Chemical Documentation

SDS cards and application log for all chemicals used on this job
03
Safety Data Sheets — On-Site
⚠️

Sodium Hypochlorite 12.5% Solution SDS ON SITE

Applied concentration: 0.6% (diluted via downstream injector from 12.5% stock)
GHS Hazard class: Oxidizer, Corrosive, Aquatic Hazard — Acute Cat. 1
PPE required: Nitrile gloves (min 8-mil), eye protection, splash-resistant apron
Spill response: Dilute with large volume of water; neutralize with sodium thiosulfate or citric acid solution; do not discharge to storm drain
Storage: Stock kept in closed container in ventilated truck compartment; temperature below 85°F at time of job
⚗️

Ecover Pro-Clean Concentrate (Surfactant) SDS ON SITE

Mix rate applied: 2 oz per gallon of SH mix
Chemistry: Non-ionic surfactant blend; plant-derived; biodegradable within 28 days per OECD 301B
GHS Hazard class: Not classified as hazardous under GHS (low-hazard formulation)
PPE required: Standard nitrile gloves; avoid prolonged skin contact
Compatibility: Verified compatible with SH at 0.6%; no exothermic reaction observed
💧

SurfaceOps Neutralizer Rinse (Citric Acid 5% Solution) SDS ON SITE

Application: Post-dwell final rinse additive; ensures pH neutralization at drain collection point
GHS Hazard class: Mildly irritating; non-corrosive at 5% concentration
PPE required: Standard gloves; no respirator required below 10% concentration
Disposal: Safe to discharge to sanitary sewer at working concentration; verified with operator handbook v3.2
Application Log
Chemical Stock Conc. Applied Conc. Volume Used Phase
Sodium Hypochlorite
SDS #1 — Oxidizer class
12.5% 0.6% (diluted) 5.3 gal stock Application pass
Ecover Pro-Clean
SDS #2 — Non-ionic surfactant
Concentrate 2 oz / gal 1.72 gal (220 oz) Mixed with SH pass
SurfaceOps Neutralizer Rinse
SDS #3 — Citric acid 5%
5% 5% (as supplied) 1 gal in rinse Post-dwell final rinse
<\!-- Section 4: Photo Evidence -->
📷

Photo Evidence

GPS-stamped before, during, and after documentation
04
Before / After — North Elevation

Before Treatment

🖼️
IMG_PRE_001.jpg North elevation — algae + lichen visible
GPS: 34.052234, -118.243685  |  07:08 AM

After Treatment

🖼️
IMG_POST_001.jpg North elevation — biological growth cleared
GPS: 34.052234, -118.243685  |  09:41 AM
Before / After — South Elevation

Before Treatment

🖼️
IMG_PRE_002.jpg South elevation — carbonation staining, lower panels
GPS: 34.052198, -118.243612  |  07:14 AM

After Treatment

🖼️
IMG_POST_002.jpg South elevation — staining removed, mortar joints intact
GPS: 34.052198, -118.243612  |  09:44 AM
During Application — Chemical & Drain Documentation

Drain Plug Installed

🖼️
IMG_DRAIN_001.jpg Storm drain inlet — rubber plug seated, pre-application
GPS: 34.052234, -118.243685  |  07:02 AM

Chemical Application — Dwell Phase

🖼️
IMG_APPLY_001.jpg Downstream injection in progress — east elevation mid-section
GPS: 34.052240, -118.243700  |  08:22 AM
GPS Location Verification
📍
34.052234, -118.243685
123 Sample Plaza, Demo District, CA 90210 — coordinates match job address on file
✅ GPS Verified
<\!-- Section 5: Operator Certification -->
📄

Operator Certification

Signed attestation, license verification, and compliance statement
05
I, M. Rivera, Lead Technician of Rivera Exterior Solutions, hereby certify that all work described in this Post-Action Report (PAR-SAMPLE-001) was performed in full compliance with applicable local, state, and federal environmental regulations. All chemicals were applied within manufacturer-specified concentrations and dwell times. Wastewater was contained and disposed of through the sanitary sewer system in accordance with applicable MS4 permit requirements. No unauthorized discharge to the municipal storm drain system occurred. All information recorded in this report is accurate and complete to the best of my knowledge.
Operator Details
Company Rivera Exterior Solutions
Technician M. Rivera, Lead Technician
Operator License #WC-DEMO-2024
Service Date April 14, 2026
Report Generated April 14, 2026, 10:03 AM — via SurfaceOps
Signatures
M. Rivera
Lead Technician Signature
Property Manager / Client (optional)
Not required for sample report
Clock In
7:02 AM
April 14, 2026 — GPS confirmed on-site
Clock Out
9:47 AM
April 14, 2026 — Site cleared and equipment stowed
⏱ Total on-site time: 2h 45m
<\!-- Mid-page CTA -->

Want this for your jobs?

SurfaceOps generates complete Post-Action Reports automatically — chemical logs, BMP checklists, pH records, GPS photo timestamps, and signed operator certifications. Everything property managers require, ready in minutes.

<\!-- /#report-container -->