\!DOCTYPE html>
| Surface | Material | Method | SH Concentration | Dwell Time | pH Entry | pH Exit | Result |
|---|---|---|---|---|---|---|---|
| Lap Siding | Fiber cement, painted flat white/gray | Soft Wash (downstream inject) | 0.5% as applied | 4 min 30 sec avg | 7.1 | 7.0 | PASS |
| Reading Point | Location | Time | pH Value | Target Range | Status |
|---|---|---|---|---|---|
| Entry (pre-application) | Tap water supply / hose bib Unit 840 | 7:08 AM | 7.1 | 6.5–9.0 | PASS |
| Mid-job | Runoff collected at building base Unit 820 | 9:15 AM | 7.2 | 6.5–9.0 | PASS |
| Post-neutralizer | Curb outfall, SW corner of cluster | 11:20 AM | 7.0 | 6.5–9.0 | PASS |
| Chemical | Role | Stock Conc. | Dilution Ratio | Applied Conc. | Volume Applied | Time Applied |
|---|---|---|---|---|---|---|
|
Sodium Hypochlorite
12.5% bulk stock
|
Primary sanitizer / organic stain remover | 12.5% | 0.5% | 160 gal total mix | 7:15 AM – 10:45 AM | |
|
GreenClean Pro Bio-Surfactant
Plant-based, non-ionic
|
Cling aid; improves dwell on vertical surface | 100% concentrate | ~0.78% | 160 oz (1.25 gal) | Blended into SH mix pre-load | |
|
EcoRinse pH Neutralizer
Citric acid base
|
Final rinse neutralizer; pH compliance | Concentrate | ~1.56% | 40 gal rinse pass | 10:50 AM – 11:15 AM |
SurfaceOps automatically generates compliant Post-Action Reports like this one on every job close — no paperwork, no manual entry. HOA-ready, print-to-PDF, always audit-proof.